top of page

Kurla–Tilak Nagar Diversion Work, 14.5-Hour Mega Block on Harbour Line

  • Writer: MimTimes मिम टाइम्स  م ٹائمز
    MimTimes मिम टाइम्स م ٹائمز
  • 1 day ago
  • 1 min read
ree

11 September 2025


Mumbai, Central Railway will operate a 14 hrs 30 mins special traffic and power block for diversion line work between Kurla and Tilak Nagar stations. The block will be in force from 11:05 pm on Saturday, 13th September 2025, to 1:35 pm on Sunday, 14th September 2025.


During this period, no Harbour line services will be available between Vadala Road and Mankhurd. Suburban services from CSMT and Panvel on the Harbour corridor will remain cancelled within the block timings.


The last trains before the block will leave Panvel at 9:52 pm and CSMT at 10:14 pm on 13th September. The first trains after the block will resume from Panvel at 1:09 pm and CSMT at 1:30 pm on 14th September.


To ease travel, special locals will run between Panvel and Mankhurd.


Central Railway has urged commuters to cooperate, noting that the mega block is crucial for infrastructure and safety improvements.




bottom of page